Skip to the content
MMEAl Murtaja Medical EquipmentSupport and knowledge base

Knowledge base › Quality control and results

Reading QC: Levey-Jennings charts and Westgard rules

When a Control result means stop, and what to check first.

A Levey-Jennings chart puts each Control result, run by run, against its mean and lines at ±1, ±2 and ±3 SD. Use the mean and SD your laboratory set for that Control lot (or the insert's, until you have your own).

RuleWhen it firesUsually means
1-2sone result beyond ±2 SDa warning: look at the other rules before releasing
1-3sone result beyond ±3 SDreject the run: random error
2-2stwo results in a row beyond 2 SD on the same sidereject: systematic error
R-4stwo results in one run more than 4 SD apartreject: random error
4-1sfour results in a row beyond 1 SD on the same sidereject: a shift
10xten results in a row on the same side of the meanreject: a shift or a trend

When a run is rejected

  1. Hold the patient results of that run.
  2. Check the Control itself: lot, expiry, how it was stored and reconstituted, a new Control lot opened recently.
  3. Check the reagent: lot, expiry, days on board, the opened date in My stock.
  4. Recalibrate if the IFU asks for it or if every level moved the same way.
  5. Rerun the Controls. Still out? Report a problem with the runs and the last calibration.